Stillwater Newsletter – January 2014

 

Stillwater Introduces Choice of Two Building Systems  


Clients tell us they’re attracted to Stillwater because of fresh contemporary design, the abundance of natural light, the spacious feel of our floor plans, and the ability to customize.  Of course, many are also attracted by the numerous benefits of prefabricated construction.
Stillwater homes are now available in your choice of two “prefab” building systems—modular and panelized.  The look of the finished home is identical, only the method of construction differs.
Our traditional modular home is fabricated and finished in a climate controlled factory and shipped to your building site in “modules” ready for quick assembly.  In the panelized system all major framing components are fabricated and assembled in a factory and shipped to the building site.  Finishing work is done onsite by a local contractor.
The modular choice provides a nearly completed home shipped to your accessible site.  The panelized system offers more flexibility in shipping, design modifications, and finishing options, plus,  generally, lower total cost.
All Stillwater designs are available in either system.

We look forward to continuing the discussion. Please give us a call or email today.
800-691-7302  |  
kaveh@stillwaterdwellings.com

Attend a Design Seminar

October and November were busy months at Stillwater. More than 75 people attended Design Seminars in Seattle and San Francisco and over 100 visited Stillwater open houses in Napa and Portland. Thanks to all!
More Seminars and Open Houses are being planned for the first quarter of 2014. Dates and locations are being finalized, and will be posted when set.